Infrastructure

Mountain Pass Highway Bridge

Design and construction of a 280-foot span bridge over challenging mountain terrain with extreme weather considerations

Location
Cascade Range, WA
Completed
2022
Budget
$8M - $10M
Role
Design Engineering Services

Key Performance Indicators

30 months
Completion Time
Completed despite weather delays
HS-25
Design Load
Heavy vehicle loading capacity
280 ft
Span Length
Single continuous span
95/100
Safety Rating
State DOT safety inspection score

Challenges

Extreme mountain conditions required innovative solutions:
- Limited construction season (6 months/year due to snow)
- Steep terrain with difficult access for equipment
- High seismic activity zone requiring advanced design
- Avalanche and rockfall risk mitigation

Our Approach

Comprehensive engineering strategy:
1. **Accelerated Construction**: Pre-fabricated steel components for rapid assembly
2. **Geotechnical Analysis**: Extensive soil testing and rock anchor foundation design
3. **Environmental Design**: Wildlife crossing considerations and minimal habitat disruption
4. **Weather Monitoring**: Real-time weather tracking for safe construction windows

Results & Outcomes

Successfully delivered critical infrastructure:
- Reduced travel time by 15 minutes for 8,000 daily vehicles
- 100-year design life with minimal maintenance requirements
- Zero environmental violations during construction
- Enhanced regional connectivity and economic development

Project Tags

bridgeinfrastructureseismictransportationsteel

Downloads

Bridge Design Details
5.5 MB
Structural Analysis Report
2.3 MB

Interested in Similar Work?

Let's discuss how we can bring the same level of expertise to your project.