Commercial

Riverside Commercial Complex

New 8-story mixed-use development with retail, office space, and structured parking on challenging riverfront site

Location
Seattle, WA
Completed
2023
Budget
$28M - $32M
Role
Engineering Services

Key Performance Indicators

On-Time
Schedule Performance
Met all milestone deadlines
+1.8%
Cost Efficiency
Minimal budget overrun due to supply chain
LEED Gold
Sustainability
Achieved LEED Gold certification
42 ft
Foundation Depth
Deep foundation due to soil conditions

Challenges

The riverfront location presented unique engineering challenges:
- Poor soil conditions requiring deep foundation solutions
- Strict environmental regulations for waterfront construction
- Flood zone considerations and elevated design requirements
- Coordination with multiple regulatory agencies

Our Approach

Strategic solutions included:
1. **Deep Foundation Design**: Implemented 42-foot drilled piers with groundwater management
2. **Environmental Protection**: Created sediment control systems and habitat protection measures
3. **Flood Resilience**: Elevated critical systems and designed flood-resistant ground floor
4. **Sustainable Design**: Integrated green roof, rainwater harvesting, and high-efficiency systems

Results & Outcomes

Delivered a landmark commercial development:
- 120,000 sq ft of premium office and retail space
- 200-vehicle structured parking with EV charging infrastructure
- LEED Gold certification with 35% energy cost savings
- Enhanced public waterfront access with new pedestrian plaza

Project Tags

commercialmixed-usefoundationsustainableleed

Downloads

Project Overview
3.1 MB

Interested in Similar Work?

Let's discuss how we can bring the same level of expertise to your project.